Kitchen refurb
Another rental property that was long overdue some attention. The floor was very weak after continuous leaks from the washing machine, the adjacent bathroom and even the communal water pipes. In the end we ripped up the whole floor back to the concrete block floor and let it dry before starting again. Definitely added value to its rental income.

Years of neglect in a rental flat 
Definitely at the end of its life 
Units removed to reveal the state of the floor 
Chipboard subfloor rotten 
No short cuts, the whole subfloor needs to go 
Subfloor removed and the concrete block floor can be left to dry out now all the leaks have been found and fixed 
New plywood subfloor fitted 
All gaps filled to keep out mice 
Starting on the rebuild 
Gloss white, low maintenance for new tenants 
Easy to clean gloss tiles 
Maximum storage in a small room 
All finished ready for the new tenants